Professional demolition Warsaw - comprehensive dismantling of the Curtis Plaza office building located at 18 Wołoska Street. The project involved the demolition of a 6-story building from 1993, which initiated the development of the Służewiec busines
Challenges
- The location of the building in a densely built-up office district of Warsaw required detailed planning of demolition logistics with minimal impact on surrounding buildings and traffic
- The necessity to maintain traffic continuity on one of Warsaw's major arteries - Wołoska Street throughout the entire demolition process
- Selective dismantling of structural elements due to the historical significance of the building as the first modern office building in Służewiec and a pioneer of the open space concept in Poland
- Complex structure of the office building, combining reflective glass, facade panels and metal elements, requiring specialized dismantling techniques
- Presence of a bank vault in the underground part of the building, requiring special safety procedures during demolition
- Conducting the demolition of an iconic 1990s building, a symbol of Warsaw's "Mordor" business district, while maintaining social sensitivity towards the sentiment of the local community
Our solutions
- Conducting a detailed structural analysis and developing a multi-stage demolition plan adapted to the office building's structure
- Using specialized demolition excavators with long reach arms, enabling precise demolition while maintaining control over falling elements
- Implementation of an advanced water spraying system reducing dust during demolition works in the center of Warsaw
- Development of a detailed work schedule adapted to traffic intensity in the area of Wołoska Street, with intensification of work during night hours and weekends
- Application of the top-down method for dismantling, with priority removal of the characteristic purple "tube" and glass facade elements before proceeding to demolish the load-bearing structure
- Using mobile crushers to process debris on site, reducing the number of truck trips and minimizing impact on city traffic
- Implementation of special safety procedures when dismantling the vault, including the involvement of specialized companies dealing with such facilities
Results
- Successful completion of the demolition of Służewiec's first modern office building without any safety incidents
- Recovery and recycling of 85% of building materials, including all steel structures, glass and aluminum from the facade
- Timely completion of all demolition works according to schedule, despite the complex structure of the building
- Preparation of the site for new investment in accordance with the zoning plan providing for service buildings up to 6 floors
- Minimal disruption to the functioning of surrounding office buildings and traffic on Wołoska Street
- Implementation of a project symbolizing the transformation of the Służewiec district from an exclusively office area towards mixed-use development
Project gallery




Project details
Location
Warsaw, Poland
Implementation period
2024
Category
Demolition
Services within the project
- Demolition
Similar case studies

Summary of works on the demolition of the Unitra Polkolor CRT plant in Piaseczno
The project involved the comprehensive demolition of the historic Unitra Polkolor CRT plant in Piaseczno, one of the lar...

Demolition of the Atrium office building in Warsaw
The Atrium International building in Warsaw, commissioned in 1995, was one of the first modern office buildings in the c...